Diesel generator 450 KVASakr-Scania
Inferred equipment class — the model is confirmed in your quote
Code EXN-Z9967
- Model
- Available Upon Request
- Power
- 450 KVA
Listed by EXON
Operator included Delivery extra Fuel on you
Page 6 of 6 — 65 machines
Inferred equipment class — the model is confirmed in your quote
Code EXN-Z9967
Listed by EXON
Operator included Delivery extra Fuel on you
Inferred equipment class — the model is confirmed in your quote
Code EXN-R9P1H
Listed by EXON
Operator included Delivery extra Fuel on you
Inferred equipment class — the model is confirmed in your quote
Code EXN-TQ8CF
Listed by EXON
Operator included Delivery extra Fuel on you
Inferred equipment class — the model is confirmed in your quote
Code EXN-FTFCE
Listed by EXON
Operator included Delivery extra Fuel on you
Inferred equipment class — the model is confirmed in your quote
Code EXN-VMVM4
Listed by EXON
Operator included Delivery extra Fuel on you
Diesel generators for site power, standby supply and equipment commissioning, from 6.5–500 KVA. Size the set on the combined load and motor starting current, not on running load alone. Makes in our range include ATOS, Perkins, Teksan.
Setting up a site generator in Egypt: prime vs standby rating, silent units near homes, fuel records, cables, earthing and ATS, and what to settle first.
A step-by-step guide to sizing a diesel generator for a construction site — load lists, starting currents, kW vs kVA, derating for Egyptian heat and dust.
A practical guide to lighting tower rental for night work on Egyptian sites: LED vs metal halide, how many towers a pour needs, placement, fuel and glare.
How equipment rental rates work in Egypt: why monthly terms cost less per day, what a rental day includes, minimum periods, standby hours, deposits and delivery.
Add up the loads that run together, allow for the starting current of motors, hoists and compressors, and keep a margin. The guide “Sizing a diesel generator for a construction site” shows the steps — or send us the load list with your request.
Yes. EXON's machines are rented with an EXON operator, maintained and inspected, and delivered to your site anywhere in Egypt. The minimum rental is 1 month (26 working days) in Cairo and 2 months outside Cairo.
Pick a model from the list and add it to your request, or message us on WhatsApp with the size, the dates and the project location — we reply with a quote.
Can't see the size or model you need?
Message us on WhatsApp