Safe Distance From Power Lines for Cranes and Excavators: Clearances by Voltage
In this article
A truck-mounted crane sets up on a villa plot to lift a water tank onto the roof. The lift is light, the outriggers are down, and the load chart is fine. The line along the road boundary is about 5 metres from the tip of the boom when it slews, and nobody looked up before setting up. The boom doesn't have to touch the line to kill someone: the UK safety regulator warns that coming close to live conductors can cause a flashover, an arc that jumps the gap, and that contact can be lethal at voltages as low as 230 V.
This guide explains the safe distance from power lines for cranes, excavators and any machine with a boom: the clearance for each voltage in metres, the 6-metre zone that should trigger a plan, what to do when the line can't be moved, and what the crew must know if a machine does touch a line.
The figures come from the US crane rule, OSHA 29 CFR 1926.1408 to 1926.1411, and the planning steps from the UK HSE's guidance on overhead lines. They are foreign references, not Egyptian law, but they are among the clearest published rules and a sensible minimum for a site in Egypt. The line's owner always has the final word on the distance for a particular line.
Which machines are at risk
Mobile cranes are the obvious case, but they are not the only one. Anything that reaches up can reach a line:
- Mobile and truck-mounted cranes, including the load, the hook and the load line, not just the boom.
- Telehandlers at full extension, and the loads they carry.
- Excavators working at full reach, or slewing to load a truck.
- Tippers raising the body to tip, and concrete pump booms.
- Lighting towers, with a mast that rises on site, and scissor lifts and man lifts.
- Long materials carried by hand: rebar, scaffold tubes, aluminium ladders.
The safe distance from power lines, by voltage
OSHA's Table A gives the minimum clearance between the line and any part of the equipment, load line or load. Here it is in metres:
| Line voltage (nominal) | Minimum clearance |
|---|---|
| Up to 50 kV | 3.0 m (10 ft) |
| Over 50 to 200 kV | 4.6 m (15 ft) |
| Over 200 to 350 kV | 6.1 m (20 ft) |
| Over 350 to 500 kV | 7.6 m (25 ft) |
| Over 500 to 750 kV | 10.7 m (35 ft) |
| Over 750 to 1,000 kV | 13.7 m (45 ft) |
Measure the clearance at the machine's maximum working radius, not where it happens to be parked. The boom slews, the load swings, and the line itself sags and sways. Leave room for where the line could be on a hot, windy afternoon, not just where it is in the morning.
The 6-metre zone: when you need a plan
The rule that matters most for planning is simpler than the table. Under OSHA 1926.1408, if any part of the equipment, load line or load could get closer than 20 feet (about 6 m) to a power line at maximum working radius, the work needs one of three arrangements:
- The line is de-energised and visibly grounded at the worksite, confirmed by its owner.
- Everything stays more than 6 m away.
- Everything stays outside the Table A distance, which means first finding out the line's actual voltage.
For lines over 350 kV, OSHA 1926.1409 replaces the 20 feet with 50 feet, about 15 m.
So the first question at the site visit is not "how close is the line?" but "could anything get within 6 metres of it?" If the answer is yes, the lift has to be planned around the line before the crane is booked.
You cannot judge the voltage by eye
Egypt's network runs from low-voltage street supply through medium-voltage distribution lines up to 500 kV transmission lines. From the ground you can't tell which one you're looking at, and a guess is no basis for a clearance.
- Ask the owner. For street and medium-voltage lines, that is the local electricity distribution company. For transmission towers, it is the Egyptian Electricity Transmission Company. OSHA requires the utility to give the voltage within two working days of a request. Egyptian utilities have no equivalent rule, so ask early.
- Assume it is live. Both OSHA and HSE say the same thing: treat every line as energised unless its owner confirms it has been switched off and grounded at the site. Treat it as uninsulated too, unless the owner confirms otherwise. Cable that looks covered may not be insulated for that voltage.
- Until you have the answer, plan to the larger distance, not the smaller one.
Controls on site, in order
HSE's order of preference is the one to follow: remove the danger before you manage it.
- Avoid the line. Set the crane up on the other side of the building, use a longer boom from further away, or move the delivery point. Decided at the site visit, this usually costs nothing.
- Divert or isolate it. Ask the owner to move the line clear of the work area, or to switch it off for the duration of the lift. That needs notice and the owner's confirmation, so book it before the crane, not on the day.
- Work beside it with controls. This is the last resort, for when the line can't be moved or switched off.
If the line stays live, OSHA requires a planning meeting with the operator and crew. It also requires an elevated warning line, barricade or line of signs at the 6 m (or Table A) distance, placed where the operator can see it, and non-conductive tag lines. On top of that, at least one of the following:
- a proximity alarm;
- a dedicated spotter in continuous contact with the operator;
- a range control warning device, or a device that automatically limits the range of movement;
- an insulating link between the load line and the load.
HSE adds the site layout around the line. Where no machines need to pass under it, barriers keep them away. Where machines must pass, make a defined passageway, as narrow as the work allows and ideally crossing at right angles, marked with goal posts and warning notices.
A proximity alarm or a range limiter is a back-up, not a licence to work closer. OSHA requires these devices to be used within their manufacturer's procedures and limits, and the crew must be trained on those limits.
Travelling under a line
Moving a machine under a line with no load is covered by OSHA 1926.1411. Lower the boom or mast, keep speed and ground in mind so a bounce doesn't close the gap, and use a dedicated spotter if any part will get within 6 m. At night or in poor visibility, light or mark the line and use a set route. Table T gives the travel clearances:
| Line voltage (nominal) | Clearance while travelling, no load |
|---|---|
| Up to 0.75 kV | 1.2 m (4 ft) |
| Over 0.75 to 50 kV | 1.8 m (6 ft) |
| Over 50 to 345 kV | 3.0 m (10 ft) |
| Over 345 to 750 kV | 4.9 m (16 ft) |
| Over 750 to 1,000 kV | 6.1 m (20 ft) |
These are travel figures only. As soon as the machine stops to work, the Table A distances apply. Check the delivery route too: a crane on a lowbed is often taller than the trailer driver expects. Route planning is covered in moving heavy equipment between sites.
Excavators and tippers: the everyday risk
Crane lifts are planned; earthworks under a line often aren't. A tipper raising its body under a line, or an excavator slewing over the boundary to load one, uses the same physics as a crane boom.
- Put the truck loading point well away from the line, never under it.
- Set the tipping point for fill outside the line's corridor, and mark it.
- On a basement or a trench along a street, mark where the line runs on the ground before the first machine arrives.
If a machine touches a line
OSHA requires every operator and crew member working near lines to be trained on what to do after contact. In plain terms:
- The operator stays in the cab, unless fire, explosion or another emergency forces them out.
- Never touch the machine and the ground at the same time. That is how the current passes through a person. If the operator must leave, they need to know in advance the safest way to get off a machine that may be live.
- The ground around the machine can be live (step potential). Keep everyone back, and keep the crew from approaching or touching the machine or the load.
- Call the line's owner to switch it off, and don't let anyone approach until the owner confirms the line is dead.
Go over this in the planning meeting. After contact, there is no time to explain it.
What to send with the rental request
Most lessors in Egypt ask for site photos before quoting a crane, and lines are one reason why. Include:
- Photos that show the lines and their position relative to the lift.
- Your estimate of the distance from the lift and set-up area to the nearest line.
- The voltage, if the owner has confirmed it, or "unknown".
- Whether you have arranged a shutdown or diversion, with the date.
The rest of the request, the load, radius and ground, is covered in how to choose a crane for your lift, and the capacity check is in how to read a crane load chart. If a telehandler might do the job instead, telehandler vs crane covers the trade-off, and the same clearances apply.
Quick checklist
- Look up at the site visit, and photograph every line near the work.
- Could anything get within 6 m at maximum reach? If yes, plan around the line.
- Get the voltage from the owner, and assume the line is live until the owner confirms otherwise.
- Move the work first, then divert or isolate the line, and only then work beside it with controls.
- Mark the distance where the operator can see it, and add an alarm, a spotter or a limiter.
- Brief the crew on what to do after contact before the first lift.
Next step
Once the lift is planned around the line, browse crane rental to compare capacities and request a quote, or message us on WhatsApp with the site photos, the load and the distance to the line.
Sources and scope
Each source supports the topic described below, not every statement in this article. Foreign guidance does not replace Egyptian requirements or site rules. Use the manual matching the machine model and serial number for operation.
- OSHA 29 CFR 1926.1408 — Power line safety (up to 350 kV), equipment operations
The 20-foot work-zone trigger, Table A minimum clearance distances by voltage, warning lines, spotters and alarms, lines presumed energized, and training on electrical contact. US crane rule, not Egyptian law.
- OSHA 29 CFR 1926.1409 — Power line safety (over 350 kV)
For lines over 350 kV and up to 1,000 kV, the 20-foot distance becomes 50 feet. US crane rule, not Egyptian law.
- OSHA 29 CFR 1926.1411 — Power line safety while traveling under or near lines
Table T clearances for equipment travelling with no load, lowered boom, spotter within 20 feet, and marking lines at night. US crane rule, not Egyptian law.
- HSE — Electricity: overhead power lines (construction)
Avoid, divert or isolate lines; barriers, passageways at right angles, goal posts and warning notices; assume lines are live; flashover without contact. UK guidance, not Egyptian law.
Need a machine for your site?
Browse EXON's maintained fleet or talk to the team for a project quote.
Keep reading
Sling Angle Load Calculation: How Much Each Leg Really Carries
Sling angle load calculation for site lifts: why a 4-tonne load can put 4 tonnes on each leg, the L ÷ H method, worked examples and when to retire a sling.
Excavation Slope Angle by Soil Type: How Far Back to Cut the Sides
Excavation slope angle by soil type: 53°, 45° and 34° from the OSHA table, how to work out the top width and extra volume, and when to support the sides.
Crane Outrigger Pad Size: Working Out Ground Pressure Before the Lift
Crane outrigger pad size explained: outrigger load ÷ pad area = ground pressure, worked examples in kN/m² and kg/cm², who checks the ground and what to send.